Efficiency of two-stage heating of water on CHP plant with turbines of type T-250/300-240
https://doi.org/10.24223/1999-5555-2019-12-3-213-219
Abstract
About the Authors
E. T. IlinРоссия
Department TPP
S. P. Pechenkin
Россия
A. V. Svetushkov
Россия
J. A. Kozlova
Россия
References
1. Instruction manual for turbine type T-250/300-240. TMT-110650-2. Ekaterinburg 2017;: 187. (In Russ.)
2. Sokolov E. J. Central heating and heating networks. 7th edition. M.: Publishing house of MPEI. 2001;: 472. (In Russ.)
3. Ilin Е. Т., Pechenkin S. P., Krylenko M. A. Stage heating network of water with the use of partial bypass line heaters//Energy saving and Water treatment. 2014; (3); 27–30. (In Russ.)
4. Factory specifications «Underheating temperature graph of network heater model HNH-5000-2.5(3)-8» Instruction manual of network heating system for turbine type T-250/300-240 2017. (In Russ.)
5. Building codes and regulations: BC&R 23.01.99 – 85. Construction climatology [Text]: regulative technical material. Moscow. 2012: 109. (In Russ.)
6. Operation schedule of the heating system for CHP plant with turbine model Т-250/300-240 PSC «Mosenergo» 2017. (In Russ.)
7. JSC «Administrator of trading system of energy market» [Online resourse]: Wholesale market of electric energy and power URL: https:// www.atsenergo.ru/ (reference date: 01.05.2017). (In Russ.)
8. LLC «Gazprom mezhregiongaz Moscow» [Online resourse]: Natural gas tariffs for industrial companies URL: http://gazmsk.ru/pages/110_0. htm (reference date: 01.05.2017). (In Russ.)
Review
For citations:
Ilin E.T., Pechenkin S.P., Svetushkov A.V., Kozlova J.A. Efficiency of two-stage heating of water on CHP plant with turbines of type T-250/300-240. Safety and Reliability of Power Industry. 2019;12(3):213-219. (In Russ.) https://doi.org/10.24223/1999-5555-2019-12-3-213-219
JATS XML


























