

Modular design of steam turbines
https://doi.org/10.24223/1999-5555-2023-16-3-167-175
Abstract
The key areas of steam turbine construction development are the issues of improving the tools and means of development, production, operation and managing the life cycle (LC) of the main and auxiliary equipment.
Observations show that measures to improve the pre-production and actual manufacturing are often carried out separately without a common idea, with different approaches, tools and solutions, which leads to duplication of work, lack of a common line of development to the goal and sometimes incompatibility. Irrational and uneven problem solving should change in favor of a systematic approach to the development of the enterprise, its products and product LC management tools.
The "dead end" of extreme unification, typification and standardization restricts and stops the development of products and their production; therefore, a new idea is needed that allows for a unified systematic approach to development and growth (up to explosive growth) against the background of stalled competitors. A new idea or ideology may be the methodological application of the modular principle of creating equipment with simultaneous digital transformation of the enterprise, which should be implemented with methodological and administrative support for the transition of the turbine enterprise from the "old" approaches to the "new" ones.
The application of an integrated approach to the implementation of the modular principle with simultaneous digital transformation of turbine enterprises opens up wide opportunities for enhancing competitiveness, and further operating activities using such a concept will lead to the company’s explosive growth. The new concept will allow the development and improvement of steam turbines and turbine equipment using approaches and technical solutions, achieving high technical, economic and operational indicators with reduced costs for design and engineering preparation of production and manufacture of equipment, as well as with minimal time and financial costs to carry out reconstruction and maintenance of equipment by changing modules.
About the Author
A. Y. KultyshevRussian Federation
Obukhovskoy Oborony Pr., 51, lit. AF, 192029, Saint Petersburg
References
1. Roadmap for the development of "End-to-end" digital technology "New production technologies". Moscow 2019: 49. (In Russ.)
2. Sannikova T. D., Bogomolova A. V., Zhigalova V. N. Foreign models of digital transformation and prospects for their use in Russian practice. Economic relations 2019; 9 (2): 481 – 494. (In Russ.)
3. Balakhonova I. V. Assessment of digital maturity as the first step of digital transformation of industrial enterprise processes: monograph. Penza. Publishing House of PSU 2021: 276. (In Russ.)
4. Popov E. V., Simonova V. L., Cherepanov V. V. Levels of digital maturity of an industrial enterprise. Journal of New Economy 2021; 22 (2): 88 – 109. (In Russ.)
5. Shu G., Anderl R. Industry Maturity Index 4.0. Managing the digital transformation of Companies. Acatech research. National Academy of Sciences and Technology of Germany 2018. URL: https://www.acatech.de/wp-content/uploads/2018/03/acatech_STUDIE_rus_Maturity_Index_WEB. pdf 49. Eustace Bob, Lewkovitz Adam, Osman Joel [et al.]. Are You Ready for Digital Transformation? Measuring Your Digital Business Aptitude. URL: https://assets.kpmg/content/dam/kpmg/pdf/2016/04/measuring-digital-businessaptitude.pdf
6. Steam turbines and turbine installations of the Ural Turbine Plant factory. G. D. Barinberg, Yu. M. Brodov, A. A. Goldberg, L. S. Ioffe, V. V. Kortenko, A. Yu. Kultyshev, V. B. Novoselov, Yu. A. Sakhnin, M. V. Shekhter, M. Yu. Stepanov, M. V. Shekhter, T. L. Shibaev, A. A. Yamaltdinov: monograph. Yekaterinburg: edited by Prof., Doctor of Technical Sciences Yu. M. Brodov and Candidate of Technical Sciences A. Yu. Kultyshev; 3rd ed., revised and supplemented. Aprio 2017: 540.
7. Kultyshev A. Yu., Goloshumova V. N., Alyoshina A. S. Steam-gas installations and features of steam turbines for PSU: textbook. stipend. St. Petersburg POLYTECH-PRESS 2022: 163.
8. Kasilov V. F., Kholodkov S. V. Heating steam turbines of Siemens. Teploenergetika 2017; (3): 31 – 37.
9. Gilev K. O., Kleinrock I. Yu., Kultyshev A. Yu., Skorokhodov A. V. Development of a unified line of booster compressor units for combined-cycle power units. Safety and Reliability of Power Industry 2023; 16(2): 97 – 102.
Review
For citations:
Kultyshev A.Y. Modular design of steam turbines. Safety and Reliability of Power Industry. 2023;16(3):167-175. (In Russ.) https://doi.org/10.24223/1999-5555-2023-16-3-167-175