Having CHPP involved in frequency control related to starting Belarusian NPP

https://doi.org/10.24223/1999-5555-2018-11-3-241-246

Abstract

The policy of restructuring the generating capacities of the energy system of the Republic of Belarus assumes the introduction of the the Belarusian nuclear power plant (NPP) in the coming years. The presence of external and internal factors affecting the sale of electricity from NPP will require solving a number of problems, including power redundancy and frequency control through involvement of internal power generating facilities. These include steam-turbine state power plants and combined heat and power plants (CHPP), combined-cycle power units, special mobile electric power units, the commissioning of electric boilers and accumulator tanks. The latter is a new technical solution for the Belarusian energy system that requires careful analysis to identify the optimal system for coordinated operation of co-generation power units with electric boilers and accumulator tanks. At the same time, the heating and non-heating seasons of the CHPP operation are considered. The function of the accumulator tanks with minimum and maximum power consumption is shown. At charging of the accumulator tanks, the generation of electricity by co-generation power units with thermal regulation is increased. The operation of electric boilers and accumulator tanks is considered through the example of Grodno CHPP-2. The expediency of including electric boilers in the scheme of the CHPP as the most effective means of using co-generation turbine units in the cycling mode with unloading them by electric power during the night hours is determined, which ensures the maximum reduction of the electric power output to the power system from the Belarusian NPP.

A similar approach at other industrial CHPP of the power system will, to some extent, ensure stable power supply from the Belarusian NPP. Reconstruction of the CHPP with installation of accumulator tanks will make it possible to create a flexible heat supply scheme for consumers in the conditions of night electrical unloading when the NPP power units are put into operation.

About the Authors

P. N. Korobets
Affiliatte Grodno CHPP-2, RUE Grodnoenergo
Russian Federation

10, Skidelskoe shosse, 230003, Grodno



V. V. Slovik
Affiliatte Grodno CHPP-2, RUE Grodnoenergo
Russian Federation

10, Skidelskoe shosse, 230003, Grodno



N. B. Karnitskiy
Belarussian National Technical University
Belarus

65, Nezavisimosty Avenu., 220013, Minsk



References

1. Romanyuk V. N., Bobich A. A. Evaluation of the thermodynamic efficiency of the functioning of the Belarusian power system under the conditions of the Belarusian NPP. Energy and management 2016; 4: 2–9. (In Russ.)

2. Voronov E. O., Romanyuk V. N., Sednin V. A., Bobich A. A. To the question of the estimation of the thermodynamic efficiency of the Belarusian power system. Energy and management 2016; 3: 2–7. (In Russ.)

3. Romanyuk V. N., Bobich A. A. On the issue of diversification of options for regulating the generation capacity of the Belarusian power system. Energy and management 2015; 6: 3–8. (In Russ.)

4. Starzhinsky A. L. The reliability of electric power supply schemes for the needs of the nuclear power plant. News of higher educational institutions and energy associations of the CIS. Power engineering 2015; 3: 24–31. (In Russ.)

5. Skovorodtsev S. V. Power output of the Belarusian NPP. Energy and management 2014; 4–5: 20–23. (In Russ.)

6. Molochko F. I. The draft concept of the state program for the development of the Belarusian electric power system for the period until 2020 has been prepared. Energy strategy 2014; 5: 18–21. (In Russ.)

7. Romanyuk V. N., Bobich A. A. Development of thermal schemes of CHPPs in the conditions of the United Energy System of Belarus. News of higher educational institutions and energy associations of the CIS. Power engineering 2015; 4: 31–43. (In Russ.)

8. Romanyuk V. N., Bobich A. A. Absorption heat pumps at the CHPP of the Belarusian ECO with the example of the Mozyr CHPP. Energy and management 2015; 1: 13-20. (In Russ.)

9. Trutaev V. I., Gladchuk Y. A. Electric cars as an effective regulator of the daily schedule of electric load in the power system. Energy and management 2014; 1: 8–1. (In Russ.)

10. Kovalev D. V. Kovalev Perspective modes of operation of generating equipment in the Belarusian energy system after 2020 Energy Strategy 2014; 4: 20–23. (In Russ.)


Review

For citations:


Korobets P.N., Slovik V.V., Karnitskiy N.B. Having CHPP involved in frequency control related to starting Belarusian NPP. Safety and Reliability of Power Industry. 2018;11(3):241-246. (In Russ.) https://doi.org/10.24223/1999-5555-2018-11-3-241-246

Views: 689


ISSN 1999-5555 (Print)
ISSN 2542-2057 (Online)