Limitations of adjustment load range of 325 MW combined cycle plant
https://doi.org/10.24223/1999-5555-2017-10-1-53-59
Abstract
This article presents an analysis of limitations of the adjustment load range of a 325 MW combined cycle power unit (CCP-325) based on two GTE-110 gas turbines. It is noted that CCP-325 should have the minimum capacity of about 30% of the nominal capacity (with one GTE-110 disabled) to ensure reliable operation without time restrictions. The article describes the features of GTE-110 operation:
1) Operation with inlet guide vanes (IGV) of the compressor fully opened at the GTE-110 capacity below 65% of nominal capacity required by the manufacturer.
2) GTE-110 capacity changes abruptly in the 18-48 MW range.
The following factors were taken into account to determine the CCP-325 minimum allowable capacity:
1) The minimum allowable temperature of high-pressure inlet steam set by the manufacturer is 473°C (emergency shutdown at 440°C).
2) GTE-110 is operated with gas fed into the both areas of the combustion chamber.
3) GTE-110 operation at 65-100% of the GTE-110 capacity within the range of compressor IGV adjustment.
The article shows that the minimum allowable GTE-110 capacity is determined by the lowest allowable temperature of high-pressure inlet steam, that is 450°C, on condition that the gas feeding algorithm is adjusted. Based on this conclusion, calculations of the CCP-325 minimum capacity are performed. Results are presented as follows:
1) The CCP-325 adjustment load range is 69–100% with account to the GTE-110 manufacturer’s restriction.
2) Implementation of the recommendations provided in the article will allow reduction of the CCP-325 minimum capacity to 42% of the nominal capacity.
3) Partial disabling of CCP-325 equipment will allow reduction of CCP-325 minimum capacity to 34% of the nominal capacity for operating GTE-110 and to 20% if the suggested recommendations are implemented.
It is demonstrated that energy effi ciency of unloading CCP-325 is achieved with a capacity of at least 78 MW with incomplete set of equipment and 139 MW with complete set of equipment.
About the Authors
Yu. A. RadinRussian Federation
Avtozavodskaya street, 14, 115280, Moscow, Russia
M. S. Frolov
Russian Federation
Avtozavodskaya street, 14, 115280, Moscow, Russia
References
1. Technical and economic indicators and characteristics of maneuverability of double-block CCPP-80 and monoblocks CCPP-39 Sochi TPS / Radin Yu. A., Razogreev V. G., Grishin I. A., Kuznetsov E. G. // Elektricheskie stantsii. 2011. №4, pp. 11–16.
2. The influence of components of the type P-88 heat-recovery boiler of a PGU-325 power unit on the duration of starting modes / Radin Yu. A., Frolov M. S., Krutitskii I. V., Ilyushin V. V. // Thermal Engineering. 2011. Т. 58. №9, pp. 707–712.
Review
For citations:
Radin Yu.A., Frolov M.S. Limitations of adjustment load range of 325 MW combined cycle plant. Safety and Reliability of Power Industry. 2017;10(1):53-59. (In Russ.) https://doi.org/10.24223/1999-5555-2017-10-1-53-59